Clash-free MEP BIM coordination — data centre overhead showing coordinated mechanical electrical plumbing services at LOD 500
Uncoordinated MEP services before BIM clash detection — data centre with mechanical electrical plumbing clashes
Vorher · 2D unkoordiniert
Nachher · LOD 500 koordiniert

Das Modell ist
bereits kollisionsfrei

Wir koordinieren MEP-Anlagen für Rechenzentren, Krankenhäuser und komplexe Infrastruktur in UK, Irland und Europa. Festpreis. Baustellenerfahrung. Keine Überraschungen.

Projekt starten→ Belege ansehen
Scrollen
286/337 beim ersten Mal freigegeben
19 Tage Verzug behoben in 4 Tagen
100+ Modelle · null Datenverlust
4.9 ★ Google · 18 Bewertungen
15+ years Jahre MEPF-Baustellenerfahrung
0 QA-Nacharbeit · Automatic Fire
Festpreis · keine Rechnungsüberraschungen
286/337 beim ersten Mal freigegeben
19 Tage Verzug behoben in 4 Tagen
100+ Modelle · null Datenverlust
4.9 ★ Google · 18 Bewertungen
15+ years Jahre MEPF-Baustellenerfahrung
0 QA-Nacharbeit · Automatic Fire
Festpreis · keine Rechnungsüberraschungen
Der Beweis

Zahlen, die keine
Fußnoten brauchen

4Tage
19 Tage Verzug in 4 Tagen behoben

Das Rechtsteam hatte bereits den Nachtrag zur Fristverlängerung entworfen. Wir wurden hinzugezogen. Der Nachtrag wurde nie eingereicht.

Rechtsvertreter · Google-Bewertung
286/33785%
Freigabe beim ersten Mal ist kein Zufall

Bei einem 32-stöckigen Bürohochhaus wurden 286 Zeichnungen ohne Revisionen bei der ersten Einreichung freigegeben. Die verbleibenden 51 wurden in 3 Tagen erledigt.

Tier-1-Subunternehmer · 32-Geschosser, UK
0
Der Kunde hat seine QA-Prüfungen eingestellt

Automatic Fire hat seinen QA-Prüfprozess abgeschafft — unsere Koordination war genau genug, um ihr ohne Prüfung zu vertrauen.

Wojtek Kaczmarek · BIM Manager · Automatic Fire
Executive Director · Varming Consulting Engineers

"Was AM wirklich auszeichnet, war die durchgängige Transparenz. Das hat Vertrauen geschaffen — ein solides Fundament für das, was ich als langfristige Geschäftsbeziehung sehe."

So funktioniert es

Drei Schritte, null Unklarheit

01Beratung

Festpreisangebot binnen 48 Stunden — keine vage Schätzung, die sich später verdoppelt

02Ausführung

Wir koordinieren, prüfen Kollisionen, lösen sie und kommunizieren in jeder Phase — Sie wissen immer, wie der Stand ist

03Übergabe

Freigegebene Pläne, vollständige Korrespondenz, COBie-Daten — übergeben wie von einem internen Team

Ausgewählte Projekte

Lassen Sie die Arbeit
für sich sprechen

Hospital corridor ceiling void before MEP BIM coordination — unresolved HVAC ductwork and pipe clashes
Hospital corridor ceiling void after MEP BIM coordination — clash-free mechanical electrical plumbing at LOD 500
Before
After
Gesundheitswesen · Laufend

Gesundheitswesen — Flur-Deckenhohlraum

Vollständige MEP-Koordination über der Decke. Lüftungskanäle, Rohrleitungen, Kabeltrassen und medizinische Gase in klare Trassenbereiche getrennt.

LOD 500Stufe
0Kollisionen
4Geschosse
Educational facility ceiling services before BIM coordination — MEP clashes in confined ceiling space
Educational facility ceiling services after BIM coordination — clash-free MEP routing with optimised service zones
Before
After
Bildung · Abgeschlossen

Bildung — Deckeninstallationen

Deckenhohlraum-Koordination über alle Gewerke hinweg. Trassen nach Priorität geschichtet — HLK, Rohrleitungen, Elektro, Brandschutz.

6Gewerke
LOD 500Stufe
0Kollisionen
Data centre MEP before BIM clash detection — uncoordinated mechanical and electrical services on raised floor
Data centre MEP after BIM coordination — fully coordinated HVAC cable trays and containment at LOD 500
Before
After
Rechenzentrum · Laufend

Rechenzentrum — vollständige MEP

Vollständige Koordination von Mechanik, Elektro, Kühlung und Brandschutz auf der gesamten Geschossfläche. LOD 500.

LOD 500Stufe
0Kollisionen
DCSektor
Koordinationsfortschritt72%
Data centre plantroom before MEP coordination — congested pipework and HVAC equipment with spatial clashes
Data centre plantroom after MEP BIM coordination — clash-free pipework routing with maintenance access clearances
Before
After
Rechenzentrum · Abgeschlossen

Rechenzentrum — Technikraum-Koordination

Kaltwasser-Rohrleitungen, Armaturen und Geräte koordiniert, mit in 3D geprüften Wartungszugängen.

LOD 500Stufe
0Kollisionen
High-rise vertical riser before MEP BIM coordination — unresolved mechanical electrical plumbing clashes in riser shaft
High-rise vertical riser after MEP BIM coordination — clash-free riser with coordinated services and builders work openings
Before
After
Hochhaus · Abgeschlossen

Hochhaus — Vertikalsteigungen

Querschnitts-Koordination durch den Technikraum. Steigschächte, horizontale Hauptleitungen und Geräteabstände gelöst.

42Geschosse
LOD 500Stufe
Commercial building floor plan before MEP BIM coordination — dense uncoordinated MEPF services with multiple clashes
Commercial building floor plan after MEP BIM coordination — fully resolved clash-free Revit coordination output
Before
After
Gewerbe · Abgeschlossen

Gewerbe — Geschoss-Koordination

Alle MEP-Gewerke auf Planebene koordiniert. Lüftung, Rohrleitungen, Kabeltrassen und Brandschutz — null QA-Nacharbeit.

0QA-Nacharbeit
LOD 500Stufe
Mechanical plantroom before BIM clash detection — congested AHU pipework and ductwork with spatial conflicts
Mechanical plantroom after BIM coordination — clash-free AHU pipework and ductwork with maintenance access zones
Before
After
Data Centre · Active

Rechenzentrum — horizontale Trassen

Längsschnitt-Koordination. RLT-Anschlüsse, Kaltwasser-Hauptleitungen, Kabeltrassen und Brandschutz — alle Gewerke kollisionsfrei.

LOD 500Stufe
0Kollisionen
Healthcare duct routing before MEP BIM coordination — HVAC ductwork clashing with fire protection sprinkler pipework
Healthcare duct routing after MEP BIM coordination — clash-free HVAC and fire protection sprinkler layout
Before
After
Gesundheitswesen · Abgeschlossen

Gesundheitswesen — Kanalführung

100+ Modelle in BIM360. Großdimensionierte Kanalführung mit Rohrleitungen, Elektro und Brandschutz koordiniert.

100+Modelle
0Datenverlust
01 / 08
Das entscheidende Modell

Warum Festpreis
alles verändert

Stundenabrechnung
Das versteckte Anreizproblem

Mehr Stunden = mehr Umsatz. Strukturanreiz, langsamer zu arbeiten.

Scope-Creep zahlt sich aus. Jede Revision erhöht die Rechnung.

Kosten sind unkalkulierbar. Rechnung kommt 40% höher als genehmigt.

Kein gemeinsames Ziel. Abrechenbare Stunden optimieren vs Projekterfolg — direkter Konflikt.

Festpreis · so arbeiten wir
Übereinstimmende Interessen, jedes Mal

Schnellere Lieferung = besser für uns. Wir optimieren auf Qualität und Tempo.

Nacharbeit ist unser Problem. Im Leistungsumfang behoben — keine Rechnungsüberraschungen.

Sie kennen die Kosten vor dem Start. Klarer Umfang. Budgetieren Sie mit Sicherheit.

Wir sind erfolgreich, wenn Sie erfolgreich sind. Die einzige Anreizstruktur, die funktioniert.

Director of Engineering · Jones Engineering Group

"Die Stärke von AM in der BIM-Koordination bei MEP-intensiven, komplexen Projekten hebt sie heraus. Ein unverzichtbarer Partner für jedes Projektteam, das Expertise, Präzision und erfolgreiche Umsetzung verlangt."

TJ
Director of Engineering · Jones Engineering Group
15+
Jahre baustellenbasierte MEPF-Erfahrung. MSc in Applied BIM — TU Dublin.
Wo wir arbeiten

Sektoren,
die wir aus dem Effeff kennen

In jedem Sektor, in dem wir tätig sind, haben wir unter realem Druck geliefert — auf der Baustelle, termingerecht, im Budget.

3 Projekte
Stimmen der Kunden

Was sie sagen
nach der Übergabe

Bei Google bewerten→
verifiziert · linkedin
Director of Engineering · Jones Engineering Group

"AM’s prowess in BIM coordination for high-intensity MEP content sets them apart. An invaluable asset to any project team demanding expertise, precision, and successful delivery."

It has been a privilege to work with Amer and the Artificial Modelling team, especially witnessing their deft handling of BIM coordination on intricate projects. They demonstrate an unmatched mastery in managing high-intensity MEP content within complex projects. AM’s prowess in BIM coordination for high-intensity MEP content in complex projects sets them apart, making them an invaluable asset to any project team demanding expertise, precision, and successful delivery.
TJ
Director of Engineering · Jones Engineering
verifiziert · linkedin
Executive Director · Varming Consulting Engineers

"What truly set AM apart was the transparency they maintained throughout. A solid foundation for what I foresee as a long-term business relationship."

As a director at Varming Consulting Engineers, I have had the pleasure of working with Artificial Modelling (AM) on a significant healthcare project. Our project involved an extensive extension of a hospital with a four-storey structure, requiring comprehensive BIM service, full MEP coordination, ensuring a clash-free environment, and production of both full shop drawings and builders work opening drawings. What truly set AM apart was the transparency they maintained throughout. A solid foundation for what I foresee as a long-term business relationship.
DD
Executive Director · Varming
verifiziert · linkedin
BIM Manager · Automatic Fire

"We stopped running QA checks on AM’s outputs — consistently accurate enough to deploy without review. That’s a first for us."

It is with great enthusiasm that I extend my professional endorsement for Artificial Modelling, led by Amer Agha, for their exceptional BIM coordination and clash detection services. On multiple projects, AM’s work stood out for its flawless delivery — outputs so accurate and well-coordinated that we eliminated the need for additional Quality Assurance checks. We stopped running QA checks on AM’s outputs — consistently accurate enough to deploy without review. That’s a first for us.
verifiziert · linkedin
Digital Operations Manager · mac-group.com

"Working alongside Amer was truly remarkable, reflecting his outstanding BIM expertise. Amer excels at contractual management and project delivery."

Working alongside Amer, the owner of Artificial Modelling, was truly remarkable, reflecting his outstanding BIM expertise. Amer excels at contractual management and project delivery, ensuring every aspect is handled with precision and professionalism.
EH
Digital Operations Manager · mac-group.com
verifiziert · linkedin
Bauleiter · Townlink Construction

"Amer’s active on-site participation and high-standard delivery were crucial to our project’s success."

As NTMA’s Site Manager, I’ve had the privilege of working with Amer Agha, our BIM Information Manager, whose active on-site participation and high-standard delivery were crucial to our project’s success.
verifiziert · linkedin
Engineering Manager · Jones Engineering Group

"I had the opportunity to work with Amer in facilitating the smooth transition from 3D models to 2D drawings. It would be my pleasure to recommend him."

While working at Jones Engineering as an Engineering Manager, I had the opportunity to work with Amer, specifically in facilitating the smooth transition from 3D models to 2D drawings. It would be my pleasure to recommend him for any BIM coordination role.
IW
Engineering Manager · Jones Engineering
verifiziert · linkedin
Director · Arcdox

"Our discussions throughout our interactions demonstrate Amer’s deep understanding of BIM standards and management."

I had the opportunity to engage with Amer Agha during his capstone project for his master’s degree in Applied Building Information Modelling and Management, while he was based in Ireland. Our discussions throughout our interactions demonstrate his deep understanding of BIM standards and management.
RM
verifiziert · linkedin
Planungsleiter · Jones Engineering Group

"100+ models migrated to BIM360 with zero data loss — a critical handover during COVID-19, without a single file corruption."

Working with Amer has been nothing less than exceptional. As Lead BIM Coordinator, Amer played a key role in migrating over 100 models of our New Children’s Hospital project from local servers to the cloud. Establishing a new system, and efficiently training the team — all achieved with zero data loss.
verifiziert · linkedin
Mechanical Project Engineer · Varming Consulting Engineers

"Working with AM on an expansive healthcare project has been an enlightening experience — the standard of deliverables was exceptional."

Working with Artificial Modelling (AM) on an expansive healthcare project has been an enlightening experience. As a mechanical project engineer, I’ve seen firsthand the exceptional standard of their deliverables and the efficiency of their turnaround times — without compromising quality.
CI
Christiantus Ile
Mechanical Project Engineer · Varming
verifiziert · google
Rechtsvertreter

"We had already drafted the Extension of Time addendum. A 19-day delay — resolved in 4 days. The EOT was never filed."

I recently worked with Amer and the team at Artificial Modelling as the legal representative for a client who needed an immediate review of their sprinkler system to ensure compliance with engineering requirements and building regulations. Our project was at risk of being delayed by three weeks, and we had already prepared an Extension of Time (EOT) contractual addendum. However, thanks to the incredible dedication and expertise of Amer and Artificial Modelling, the anticipated three-week delay was reduced to just four days. I have no idea how they managed to work around the clock, but their efforts saved my client from a major hassle on the project.
TW
Tomasz Wieczorek
Rechtsvertreter · Google-Bewertung
verifiziert · google
Google-Bewertung

"We entrusted our 20-story building’s MEP designs to Artificial Modelling."

We entrusted our 20-story building’s MEP designs to Artificial Modelling.
MR
Margarette Ruzol
Google-Bewertung
verifiziert · google
Google-Bewertung

"Amer is a true professional. His attention to detail in BIM and COBie standards was impressive."

Amer at Artificial Modelling is a true professional. His attention to detail in BIM and COBie standards was impressive. Highly recommend their services.
PB
Pj Baguio
Google-Bewertung
verifiziert · google
Google-Bewertung

"Turned our 2D plans into detailed 3D models with precision. Met all COBie requirements perfectly."

Artificial Modelling turned our 2D plans into detailed 3D models with precision. Amer’s professional approach ensured we met all COBie requirements perfectly.
MC
Mark Cagampang
Google-Bewertung
verifiziert · google
Google-Bewertung

"Excellent technical submittal management for our MEP project. Helped us avoid major setbacks."

Amer from Artificial Modelling provided excellent technical submittal management for our MEP project. Their expertise in constructability reviews helped us avoid major setbacks.
LM
Leomar Montoya
Google-Bewertung
verifiziert · google
Elektrofachfirma

"Project delays were recovered, and we delivered a building with PA certs two weeks prior to our agreed deadline."

As an Electrical contractor working on Polish sites, I reached out to Artificial Modelling for assistance in managing subcontractors due to constant issues with information availability. We took a closer look at the project programme and determined the best way forward. Amer shared his astonishing experience, bridging construction management and BIM at an impressive level. The process was implemented, project delays were recovered, and we managed to deliver a building with PA certs two weeks prior to our agreed final deadline.
MW
Mateusz W
Elektrofachfirma · Google-Bewertung
verifiziert · google
Tier-1-Subunternehmer

"286 out of 337 drawings approved first submission — zero revisions. Remaining 51 resolved in 3 days."

As a tier one subcontractor providing mechanical and electrical services on a 32-story office block, I had the pleasure of working with Artificial Modelling. From the initial kickoff meeting to the delivery of P01 drawings, their service was nothing short of exceptional. Out of a total of 337 drawings, 286 were approved immediately, and only 51 received minor comments, which were promptly addressed. This level of efficiency and accuracy is rare, and it made a significant positive impact on our project’s progress. I highly recommend Artificial Modelling for their outstanding service and flawless delivery.
JM
Jacek Myga
Tier-1-Subunternehmer · Google-Bewertung
verifiziert · google
Elektrofachfirma

"The professionalism and efficiency of AM’s team have set a new standard in our industry."

As an electrical contractor for a UK firm, I recently had the pleasure of collaborating with Artificial Modelling on a large-scale project. The conversion of our 2D designs to 3D was seamless, with numerous potential issues identified and resolved early on. The attention to detail in the LOD/LOI 500 delivery was particularly impressive. The professionalism and efficiency of Artificial Modelling’s team have set a new standard in our industry.
MG
Marysia Gie
Elektrofachfirma · Google-Bewertung
verifiziert · google
Inhaberin · Dietetyk.TV

"Pleasantly surprised by Amer’s genuine kindness — outstanding support beyond his core expertise."

I connected with Amer from Artificial Modelling and was pleasantly surprised by his genuine kindness. Despite his background in MEP and CSA, he provided outstanding support.
JM
Joanna Marciszewska
Inhaberin · Dietetyk.TV
verifiziert · google
Google-Bewertung

"Professionalism, Quality, Responsiveness, Value. Can recommend for any 3D work."

Positive: Professionalism, Quality, Responsiveness, Value. I can recommend those guys for any 3D work.
WB
Wet Bandits
Google-Bewertung
Wer wir sind

Aufgebaut auf Erfahrung

Amer Agha Gründer

MSc in Applied Building Information Modelling & Management (2.1 Honours) von der TU Dublin — Irlands einziges dediziertes BIM-Masterprogramm, akkreditiert durch das Chartered Institute of Building (CIOB) und Gewinner des ICE Third Level Course of the Year 2019. Dualer Studiengang: Maschinenbau & Elektrotechnik + Baumanagement.

Vor der Gründung von Artificial Modelling war Amer BIM Project Information Manager bei MAC Group, wo er den Informationsmanagement-Prozess leitete, der dem Unternehmen Irlands erste BIM-Level-2-Zertifizierung durch BRE einbrachte — berichtet von BIM Ireland. Als Lead BIM Coordinator bei Jones Engineering am New Children's Hospital Dublin koordinierte er 100+ föderierte Modelle mit einem 20+ Personen-Team und führte die Migration auf BIM360 während COVID-19 ohne Datenverlust durch.

15+ Jahre MEP-Baustellen- und Koordinationserfahrung in Rechenzentren, Krankenhäusern, Pharma-Anlagen und Gewerbeprojekten in Irland, UK und Europa.

KI-gestützt · Wöchentlich
BIM & Bau-
Intelligence Digest

Wöchentlich scannt unsere KI Branchenpublikationen — eine fokussierte Zusammenfassung dessen, was für MEP-Profis zählt. Kostenlos. Kein Spam.

Neueste · April 2026
Lassen Sie uns zusammenarbeiten
Ihr nächstes Projekt
verdient Besseres.
Kollisionsfrei · Festpreis · Geliefert.

+48 534 455 075  ·  amer@artificialmodelling.com  ·  Wrocław, Polen

© 2026 Artificial Modelling · Wrocław, PolenMEP BIM · Brandschutz · AutomatisierungGeschrieben, gestaltet und entwickelt von Amer Agha
E-Mail WhatsApp
Direkt anrufen