Coordinated Revit MEP model — data centre overhead showing clash-free mechanical electrical plumbing services after design-stage BIM coordination
Uncoordinated MEP services before BIM clash detection — data centre with mechanical electrical plumbing clashes
Before · 2D Uncoordinated
After · Coordinated Revit MEP

The model is
already clash-free

Revit MEP modelling and coordination for consulting engineers and building services consultants at design stage (RIBA Stages 2–4, LOD 300–350) — data centres, hospitals and complex buildings across the UK, Ireland and Europe. Fixed price. Site-experienced. ISO 19650-aligned.

Start a Project→ See the evidence
Scroll
Fixed-price proposal within 48 hours
Three-week delay reduced to 4 days · client Google review
ISO 19650-aligned · RIBA Stages 2–4
4.9 ★ Google · 18 reviews
15+ years MEPF site experience (since 2009)
0 QA rework · Automatic Fire
Fixed price · no billing surprises
Fixed-price proposal within 48 hours
Three-week delay reduced to 4 days · client Google review
ISO 19650-aligned · RIBA Stages 2–4
4.9 ★ Google · 18 reviews
15+ years MEPF site experience (since 2009)
0 QA rework · Automatic Fire
Fixed price · no billing surprises
The proof

Numbers that don't
need footnotes

4days
A three-week delay reduced to four days

The client had "already prepared an Extension of Time (EOT) contractual addendum". The anticipated three-week delay was reduced to just four days.

Tomasz Wieczorek · Legal representative · Google Review
48hours
A fixed price before you commit

Send us the consultant's brief and model scope. A fixed-price proposal is with you within 48 hours — RIBA Stages 2–4, LOD 300–350, ISO 19650-aligned. Within the agreed scope the number does not move.

How we quote · every project
0
The client stopped running QA checks

Automatic Fire eliminated their QA review process — our coordination was accurate enough to trust without verification.

Wojtek Kaczmarek · BIM Manager · Automatic Fire
Executive Director · Varming Consulting Engineers

"What truly set AM apart was the transparency they maintained throughout. This fostered a sense of trust — laying a solid foundation for what I foresee as a long-term business relationship."

How it works

Three steps, no ambiguity

01Consultation

Fixed-price proposal within 48 hours of the consultant's brief — not a vague estimate that doubles later

02Execution

We model and coordinate at LOD 300–350, clash-detect, resolve and communicate at every stage — you always know where things stand

03Handover

Approved layouts, full correspondence trail, COBie data — handed over like an in-house team

Selected Work

Let the work
speak for itself

Hospital corridor ceiling void before MEP BIM coordination — unresolved HVAC ductwork and pipe clashes
Hospital corridor ceiling void after MEP BIM coordination — clash-free mechanical electrical plumbing in a coordinated Revit MEP model
Before
After
Healthcare · Active

Healthcare — Corridor Ceiling Void

Full MEP coordination above ceiling. Ductwork, pipework, cable trays and medical gas separated into clear service zones.

LOD 500Level
0Clashes
4Storeys
Educational facility ceiling services before BIM coordination — MEP clashes in confined ceiling space
Educational facility ceiling services after BIM coordination — clash-free MEP routing with optimised service zones
Before
After
Educational · Complete

Educational — Ceiling Services

Ceiling void coordination across all disciplines. Services layered by priority — HVAC, pipework, electrical, fire protection.

6Disciplines
LOD 500Level
0Clashes
Data centre MEP before BIM clash detection — uncoordinated mechanical and electrical services on raised floor
Data centre MEP after BIM coordination — fully coordinated HVAC cable trays and containment in a coordinated Revit MEP model
Before
After
Data Centre · Active

Data Centre — Full MEP

Full mechanical, electrical, cooling and fire protection coordination across the entire floor plate. LOD 500.

LOD 500Level
0Clashes
DCSector
Coordination progress72%
Data centre plantroom before MEP coordination — congested pipework and HVAC equipment with spatial clashes
Data centre plantroom after MEP BIM coordination — clash-free pipework routing with maintenance access clearances
Before
After
Data Centre · Complete

Data Centre — Plantroom Coordination

CHW pipework, valves, and equipment coordinated with maintenance access clearances verified in 3D.

LOD 500Level
0Clashes
High-rise vertical riser before MEP BIM coordination — unresolved mechanical electrical plumbing clashes in riser shaft
High-rise vertical riser after MEP BIM coordination — clash-free riser with coordinated services and builders work openings
Before
After
High-Rise · Complete

High-Rise — Vertical Risers

Cross-section coordination through plantroom. Vertical risers, horizontal mains and equipment clearances resolved.

42Floors
LOD 500Level
Commercial building floor plan before MEP BIM coordination — dense uncoordinated MEPF services with multiple clashes
Commercial building floor plan after MEP BIM coordination — fully resolved clash-free Revit coordination output
Before
After
Commercial · Complete

Commercial — Full Floor Coordination

All MEP disciplines coordinated at plan level. Ductwork, pipework, cable tray and fire protection — zero QA rework.

0QA Rework
LOD 500Level
Mechanical plantroom before BIM clash detection — congested AHU pipework and ductwork with spatial conflicts
Mechanical plantroom after BIM coordination — clash-free AHU pipework and ductwork with maintenance access zones
Before
After
Data Centre · Active

Data Centre — Horizontal Services

Longitudinal section coordination. AHU connections, CHW mains, cable tray and fire protection — all disciplines clash-free.

LOD 500Level
0Clashes
Healthcare duct routing before MEP BIM coordination — HVAC ductwork clashing with fire protection sprinkler pipework
Healthcare duct routing after MEP BIM coordination — clash-free HVAC and fire protection sprinkler layout
Before
After
Healthcare · Complete

Healthcare — Duct Routing

Large ductwork routing coordinated with pipework, electrical and fire protection on a BIM 360 hospital project.

4Disciplines
BIM 360Platform
01 / 08
The model that matters

Why fixed price
changes everything

Hourly billing
The hidden incentive problem

More hours = more revenue. Structural incentive to work slower.

Scope creep is profitable. Every revision adds to the invoice.

Cost is unpredictable. Invoice arrives 40% higher than approved.

No shared goal. Optimising hours billed vs project success — direct conflict.

Fixed price · how we work
Aligned interests, every time

Faster delivery = better for us. We optimise for quality and speed.

Rework is our problem. Fixed within scope — no surprise invoices.

You know the cost before you start. Clear scope. Budget with confidence.

We succeed when you succeed. The only incentive structure that works.

Director of Engineering · Jones Engineering Group

"AM's prowess in BIM coordination for high-intensity MEP content in complex projects sets them apart. An invaluable asset to any project team demanding expertise, precision, and successful delivery."

TJ
Director of Engineering · Jones Engineering Group
15+
Years of site-based MEPF experience. MSc in Applied BIM — TU Dublin.
Where we work

Sectors we
know cold

Every sector we serve is one where we've delivered under real pressure — on site, on time, on budget.

3 projects
Client voices

What they say
after the handover

Review us on Google→
verified · linkedin
Director of Engineering · Jones Engineering Group

"AM’s prowess in BIM coordination for high-intensity MEP content sets them apart. An invaluable asset to any project team demanding expertise, precision, and successful delivery."

It has been a privilege to work with Amer and the Artificial Modelling team, especially witnessing their deft handling of BIM coordination on intricate projects. They demonstrate an unmatched mastery in managing high-intensity MEP content within complex projects. AM’s prowess in BIM coordination for high-intensity MEP content in complex projects sets them apart, making them an invaluable asset to any project team demanding expertise, precision, and successful delivery.
TJ
Director of Engineering · Jones Engineering
verified · linkedin
Executive Director · Varming Consulting Engineers

"What truly set AM apart was the transparency they maintained throughout. A solid foundation for what I foresee as a long-term business relationship."

As a director at Varming Consulting Engineers, I have had the pleasure of working with Artificial Modelling (AM) on a significant healthcare project. Our project involved an extensive extension of a hospital with a four-storey structure, requiring comprehensive BIM service, full MEP coordination, ensuring a clash-free environment, and production of both full shop drawings and builders work opening drawings. What truly set AM apart was the transparency they maintained throughout. A solid foundation for what I foresee as a long-term business relationship.
DD
Executive Director · Varming
verified · linkedin
BIM Manager · Automatic Fire

"We stopped running QA checks on AM’s outputs — consistently accurate enough to deploy without review. That’s a first for us."

It is with great enthusiasm that I extend my professional endorsement for Artificial Modelling, led by Amer Agha, for their exceptional BIM coordination and clash detection services. On multiple projects, AM’s work stood out for its flawless delivery — outputs so accurate and well-coordinated that we eliminated the need for additional Quality Assurance checks. We stopped running QA checks on AM’s outputs — consistently accurate enough to deploy without review. That’s a first for us.
verified · linkedin
Digital Operations Manager · mac-group.com

"Working alongside Amer was truly remarkable, reflecting his outstanding BIM expertise. Amer excels at contractual management and project delivery."

Working alongside Amer, the owner of Artificial Modelling, was truly remarkable, reflecting his outstanding BIM expertise. Amer excels at contractual management and project delivery, ensuring every aspect is handled with precision and professionalism.
EH
Digital Operations Manager · mac-group.com
verified · linkedin
Construction Project Manager · Townlink Construction

"Amer’s active on-site participation and high-standard delivery were crucial to our project’s success."

As NTMA’s Site Manager, I’ve had the privilege of working with Amer Agha, our BIM Information Manager, whose active on-site participation and high-standard delivery were crucial to our project’s success.
GK
Construction Project Manager · Townlink Construction
verified · linkedin
Engineering Manager · Jones Engineering Group

"I had the opportunity to work with Amer in facilitating the smooth transition from 3D models to 2D drawings. It would be my pleasure to recommend him."

While working at Jones Engineering as an Engineering Manager, I had the opportunity to work with Amer, specifically in facilitating the smooth transition from 3D models to 2D drawings. It would be my pleasure to recommend him for any BIM coordination role.
IW
Engineering Manager · Jones Engineering
verified · linkedin
Director · Arcdox

"Our discussions throughout our interactions demonstrate Amer’s deep understanding of BIM standards and management."

I had the opportunity to engage with Amer Agha during his capstone project for his master’s degree in Applied Building Information Modelling and Management, while he was based in Ireland. Our discussions throughout our interactions demonstrate his deep understanding of BIM standards and management.
RM
verified · linkedin
Planning Manager · Jones Engineering Group

"Migrating over 100 models of our New Children’s Hospital project from local servers to the cloud … all achieved with zero data loss."

Working with Amer has been nothing less than exceptional. As Lead BIM Coordinator, Amer played a key role in migrating over 100 models of our New Children’s Hospital project from local servers to the cloud. Establishing a new system, and efficiently training the team — all achieved with zero data loss.
verified · linkedin
Mechanical Project Engineer · Varming Consulting Engineers

"Working with AM on an expansive healthcare project has been an enlightening experience — the standard of deliverables was exceptional."

Working with Artificial Modelling (AM) on an expansive healthcare project has been an enlightening experience. As a mechanical project engineer, I’ve seen firsthand the exceptional standard of their deliverables and the efficiency of their turnaround times — without compromising quality.
CI
Christiantus Ile
Mechanical Project Engineer · Varming
verified · google
Legal Representative

"We had already prepared an Extension of Time (EOT) contractual addendum … the anticipated three-week delay was reduced to just four days."

I recently worked with Amer and the team at Artificial Modelling as the legal representative for a client who needed an immediate review of their sprinkler system to ensure compliance with engineering requirements and building regulations. Our project was at risk of being delayed by three weeks, and we had already prepared an Extension of Time (EOT) contractual addendum. However, thanks to the incredible dedication and expertise of Amer and Artificial Modelling, the anticipated three-week delay was reduced to just four days. I have no idea how they managed to work around the clock, but their efforts saved my client from a major hassle on the project.
TW
Tomasz Wieczorek
Legal Representative · Google Review
verified · google
Google Review

"We entrusted our 20-story building’s MEP designs to Artificial Modelling."

We entrusted our 20-story building’s MEP designs to Artificial Modelling.
MR
Margarette Ruzol
Google Review
verified · google
Google Review

"Amer is a true professional. His attention to detail in BIM and COBie standards was impressive."

Amer at Artificial Modelling is a true professional. His attention to detail in BIM and COBie standards was impressive. Highly recommend their services.
PB
Pj Baguio
Google Review
verified · google
Google Review

"Turned our 2D plans into detailed 3D models with precision. Met all COBie requirements perfectly."

Artificial Modelling turned our 2D plans into detailed 3D models with precision. Amer’s professional approach ensured we met all COBie requirements perfectly.
MC
Mark Cagampang
Google Review
verified · google
Google Review

"Excellent technical submittal management for our MEP project. Helped us avoid major setbacks."

Amer from Artificial Modelling provided excellent technical submittal management for our MEP project. Their expertise in constructability reviews helped us avoid major setbacks.
LM
Leomar Montoya
Google Review
verified · google
Electrical Contractor

"Project delays were recovered, and we delivered a building with PA certs two weeks prior to our agreed deadline."

As an Electrical contractor working on Polish sites, I reached out to Artificial Modelling for assistance in managing subcontractors due to constant issues with information availability. We took a closer look at the project programme and determined the best way forward. Amer shared his astonishing experience, bridging construction management and BIM at an impressive level. The process was implemented, project delays were recovered, and we managed to deliver a building with PA certs two weeks prior to our agreed final deadline.
MW
Mateusz W
Electrical Contractor · Google Review
verified · google
Tier 1 Subcontractor · Google Review

"Out of a total of 337 drawings, 286 were approved immediately, and only 51 received minor comments, which were promptly addressed."

As a tier one subcontractor providing mechanical and electrical services on a 32-story office block, I had the pleasure of working with Artificial Modelling. From the initial kickoff meeting to the delivery of P01 drawings, their service was nothing short of exceptional. Out of a total of 337 drawings, 286 were approved immediately, and only 51 received minor comments, which were promptly addressed. This level of efficiency and accuracy is rare, and it made a significant positive impact on our project’s progress. I highly recommend Artificial Modelling for their outstanding service and flawless delivery.
JM
Jacek Myga
Tier 1 Subcontractor · Google Review
verified · google
Electrical Contractor

"The professionalism and efficiency of AM’s team have set a new standard in our industry."

As an electrical contractor for a UK firm, I recently had the pleasure of collaborating with Artificial Modelling on a large-scale project. The conversion of our 2D designs to 3D was seamless, with numerous potential issues identified and resolved early on. The attention to detail in the LOD/LOI 500 delivery was particularly impressive. The professionalism and efficiency of Artificial Modelling’s team have set a new standard in our industry.
MG
Marysia Gie
Electrical Contractor · Google Review
Who we are

Built on experience

Amer Agha Founder

MSc in Applied Building Information Modelling & Management (2.1 Honours) from TU Dublin — Ireland's only dedicated BIM master's programme, accredited by the Chartered Institute of Building (CIOB) and winner of the ICE Third Level Course of the Year 2019. Dual-stream: Mechanical & Electrical Engineering + Construction Management.

Before founding Artificial Modelling, Amer served as BIM Project Information Manager at MAC Group, where he led the information management process that earned the company MAC Group's BIM Level 2 certification from BRE — covered by BIM Ireland. As Lead BIM Coordinator at Jones Engineering on the New Children's Hospital Dublin, he managed the coordination of more than 100 federated models with a team of 20+ and led the transition to cloud-based BIM360 during COVID-19.

15+ years of MEP site and coordination experience across data centres, hospitals, pharmaceutical facilities, and commercial projects in Ireland, the UK, and Europe.

Services & guides

Outsourced MEP BIM, explained

Revit MEP modelling and BIM coordination for design-stage consulting engineers and building services consultants in the UK and Ireland (RIBA Stages 2–4, LOD 300 and LOD 350 models) — plus the guides we wrote on cost, process and choosing a partner.

AI-Powered · Weekly
BIM & Construction
Intelligence Digest

Every week, our AI scans industry publications — a focused summary of what matters for MEP professionals. Free. No spam.

Latest · April 2026
Let's work together
Your next project
deserves better.
Clash-free · Fixed price · Delivered.

+48 534 455 075  ·  amer@artificialmodelling.com  ·  Wrocław, Poland

© 2026 Artificial Modelling · Wrocław, PolandMEP BIM · Fire Protection · AutomationWritten, designed & built by Amer Agha
Email WhatsApp
Call directly