What does outsourced Revit MEP modelling cover?
Most building services consultancies do not need another engineer when a deadline bites. They need the design that their engineers have already worked out to be in the model, on the sheets and coordinated, by the stage date. That is the gap we fill: a Revit resource that sits alongside your design team, takes your engineers' mark-ups and turns them into a model and drawings that look as though your own drawing office produced them.
We model all the services an M&E practice normally carries:
- Mechanical: ductwork, air handling and terminal units, heating and chilled water, refrigerant, plant rooms and plant connections.
- Electrical: containment, cable tray and ladder, busbar, distribution boards, lighting and small power layouts, and HV/LV rooms.
- Public health: above-ground drainage with modelled falls, soil and vent stacks, rainwater, hot and cold water services.
- Fire: sprinkler and wet/dry riser pipework, coordinated with the other services. See our fire protection design service.
Work can start from a Revit model you have begun, from engineer mark-ups on PDF, from sketches and schedules, or from legacy 2D CAD that needs converting. If you are weighing a move from 2D to a full Revit workflow, our article on 2D to 3D coordination: cost-benefit and breakeven sets out the trade-offs.
What do we need from your engineers?
The quality of outsourced modelling depends on the quality of the brief. To start a package we ask for:
- Your Revit template, families, shared parameters and title blocks, or permission to work in your project files directly.
- The project BEP, or your office BIM standards if there is no project BEP yet.
- Current architectural and structural models, with the agreed shared coordinates.
- Engineer mark-ups: layouts, schematics, sizes and any calculation outputs you want reflected in the model.
- The stage, deliverable list and issue date, so we can agree the level of information need for each system.
We do not redesign your systems. If a mark-up conflicts with the architecture, the structure or another service, we raise it with a proposed fix and wait for your engineer's decision. Our checklist for incoming models is in preparing your Revit model for coordination.
How does "you mark up, we model" work week to week?
- Kick-off call with the project lead to agree scope, priorities, standards and the issue programme.
- Weekly model drops. We issue an updated model to your CDE on an agreed day, with a short note of what changed and what is waiting on information.
- Mark-up turnaround. Your engineers mark up the drop; we incorporate the comments in the next cycle, or sooner if the stage date needs it.
- Query log. Every open question sits in one log with an owner and a date, so nothing is lost in email.
- Sheet production. Plans, sections, schematics and builder's work drawings produced on your title blocks to your drawing conventions.
You have one point of contact throughout. We are based in Wrocław, one hour ahead of London and Dublin, so reviews happen in your working day on Teams or by phone. Supervision overhead is a real cost of any outsourcing arrangement; we keep it low on purpose, and explain why it matters in the management overhead nobody talks about.
How do you keep our template, families and standards?
We work in yours, not ours. That means your view templates, line weights, annotation families, system types, worksets and naming. Where your standards say nothing, we ask rather than invent. The aim is that a drawing we produce can be issued with your revision block and nobody outside the office can tell who modelled it.
Our information management is ISO 19650-aligned: we follow your file naming, status and suitability codes, and move information through the work-in-progress, shared and published states of your CDE. On Autodesk Construction Cloud or BIM 360 we work inside your hub with the permissions you set. Details of NDAs and GDPR are on our trust and security page.
Repetitive tasks, such as sheet set-up, view creation, parameter filling and tagging, are scripted where it is safe to do so, which keeps the fixed price competitive without cutting checking time. See automating repetitive BIM tasks.
What does Revit MEP modelling cost compared with hiring a technician?
Salary is only the visible part of a hire. In Dublin, Morgan McKinley's 2026 guide puts BIM technicians at €30–35k with up to three years' experience, €35–45k at three to five years and €45–55k beyond that; BIM coordinators with five years or more reach €60–80k (Morgan McKinley 2026). Employer PRSI is 11.40% from October 2026 and auto-enrolment adds 1.5% employer pension (BrightSG). On our calculation, a €50k salary costs about €56.5k before software, hardware, desk space, training and management time.
In the UK, a BIM technician in London earns around £32k to £45k (low to high), and £28k to £40k in the regions (Architecture Social); London MEP Revit technician roles are advertised at £35–45k (Pertemps). Employer National Insurance is 15% above £5,000 from April 2025 (gov.uk), and freelance BIM technicians charge around £350–400 a day (ContractorUK). Building services salaries rose 3.5% in 2026 (CIBSE Journal), and building services firms are described as the hardest hit by the skills shortage (Building).
| In-house hire | Artificial Modelling | Offshore bureau | |
|---|---|---|---|
| Cost basis | Salary plus on-costs (Dublin technician €30–55k; London £32–45k) plus licence, hardware, management | Fixed price per package, quoted in 48 hours | Low hourly rate; checking and rework time sits with you |
| Time to start | Recruitment, notice period and onboarding | Agreed at quote; pilot on one floor or plant room | Usually quick to start |
| Between commissions | Fixed cost continues | Scales down to zero | Often minimum commitments |
| Working hours | Your hours | One hour ahead of UK and Ireland | Often several hours' difference |
| Engineering literacy | Depends on the hire | Site-experienced MEP coordinators | Risk of "engineering as drafting" |
| Standards and data | Your systems | Your template and CDE; EU-based, GDPR | Varies; check where data is held |
Salary figures: Morgan McKinley 2026 (Dublin), Architecture Social (London). Offshore risk quote: MVN. For the full loaded-cost model, see the true cost of an in-house BIM team vs outsourcing.
When does overflow capacity make more sense than a permanent hire?
A permanent hire is the right answer when the workload is steady and you can keep a modeller busy for years. Overflow capacity makes more sense when:
- Your workload is lumpy: a large commission lands, two stage issues collide, then things go quiet again.
- A technician has left mid-project and the replacement is months away.
- The project is in a sector with dense plant, such as data centres, healthcare or pharmaceutical, where you want coordinators who have done it before.
- You want your own engineers designing rather than drawing.
Many practices use both: in-house modellers for baseload work and a partner for peaks. On how fixed-price and hourly arrangements compare over a year, see fixed-price vs time and materials. CAD and BIM bureaux that need white-label capacity should read our partner programme page.
How do you check modelling quality before it reaches you?
Every drop goes through internal checks before it leaves us: model warnings and health, system connectivity and classification, correct families and parameters, clashes against the current architectural and structural models, and a sheet check against your conventions. Our coordinators come from site, so they also look at what an installer would ask: access to valves and dampers, maintenance space, and whether a route can actually be supported.
For design-stage coordination across a whole building, see building services BIM coordination; for clash testing and combined services drawings, see MEP clash detection. UK practices facing Gateway 2 deadlines may also want our MEP BIM outsourcing UK page.
How does the fixed-price pilot work?
If you have not outsourced modelling before, or were let down last time, start small. The pilot is a paid, fixed-price package on one floor or one plant room of a live project.
- One floor or one plant roomyour models, your template
- About 10 working daysfrom complete inputs to coordinated model
- Fixed quote in 48 hoursagreed before any work starts
We model from your mark-ups in your template and return the model, sheets and a query log. Your engineers judge it exactly as they would judge work from their own team.
Request a pilot quoteFrequently asked questions
Can you model in our own Revit template?
Yes. We work in your template, families, shared parameters and title blocks, and follow your BEP and drawing conventions so the output can be issued as your own.
Which services do you model?
Mechanical, electrical, public health and fire protection services, including plant rooms, risers, containment, drainage with modelled falls and sprinkler pipework.
Do you design the systems or only model them?
We model your engineers' design. Where a mark-up conflicts with the architecture, structure or another service, we raise it with a proposed resolution and your engineer decides.
How quickly can you start?
We return a fixed-price proposal within 48 hours of receiving the scope, and agree a start date and issue programme in that proposal. A pilot on one floor or one plant room is the usual first step.
Does outsourcing cost less than hiring a Revit technician?
It depends on how steady your workload is. A hire carries salary, employer on-costs, licences, hardware and management time all year; outsourced capacity is a fixed price per package that stops when the peak ends. We compare both openly in our cost articles.
Where is our project data held?
On your projects we work inside your Autodesk Construction Cloud or BIM 360 hub with the permissions you assign. We are an EU business working under GDPR and sign NDAs on request.
Sources
- Morgan McKinley – Ireland construction salary guide 2026, accessed October 2026.
- Architecture Social – BIM technician salary (UK), accessed October 2026.
- Pertemps – MEP Revit technician, London, accessed October 2026.
- BrightSG – My Future Fund and PRSI, Budget 2026, accessed October 2026.
- gov.uk – Rates and thresholds for employers 2025 to 2026, accessed October 2026.
- ContractorUK – BIM technician contract rate, accessed October 2026.
- CIBSE Journal – building services salaries 2026, accessed October 2026.
- Building – Skills shortage deepens, services hit hard, accessed October 2026.
- MVN Services – Why offshore MEP design outsourcing fails, accessed October 2026.