Why are Irish consultants outsourcing MEP BIM now?
Three things have changed at the same time. Demand is up: Irish construction output is forecast to grow 5.3% in 2026 (EY/Euroconstruct), and the revised National Development Plan sets out €275.4bn of public investment (Mason Hayes & Curran). The information-management bar is higher, because public clients now expect ISO 19650 delivery from their supply chain. And the people who do the modelling are hard to find: the Build Digital Survey 2025 names skills gaps as the main barrier to ISO 19650 adoption (Construction News IE).
For a building services consultancy of 20 to 60 people, that combination usually shows up as senior engineers producing designs faster than the office can model them. Outsourcing the modelling and coordination keeps the engineering in-house and adds Revit capacity only when a commission needs it.
What does CWMF Milestone 6 mean for M&E consultants?
Ireland’s Capital Works Management Framework has been phasing in BIM requirements since 2024. Milestone 6, from 1 January 2026, is reported to extend ISO 19650 requirements to the supply chain on public works above €10m (Fit Out Awards; see also NSAI). Published thresholds differ between sources, so check the tender documents for each commission.
For an M&E consultant on a public scheme for a health, education, housing or state-property client, ISO 19650 is practical, not abstract. It means:
- responding to the appointing party’s information requirements with a BIM Execution Plan;
- delivering information containers named, classified and status-coded to the project standard;
- working in the common data environment’s states (work in progress, shared, published, archived) with checks before anything is shared;
- following the project’s security requirements, which ISO 19650-5 expects to be documented for every appointed party (BIM+).
We work this way by default. Our models and sheets are named and coded to your BEP, built in work in progress in your CDE, and checked before they move to shared. We are ISO 19650-aligned; if a client asks for evidence, we provide a sample of our naming, status coding and model QA, and certificate details are available on request.
What does it cost to hire a BIM technician in Dublin instead?
Morgan McKinley’s 2026 Dublin salary guide gives these permanent bands (Morgan McKinley):
| Role | 0–3 years | 3–5 years | 5+ years |
|---|---|---|---|
| BIM Technician | €30–35k | €35–45k | €45–55k |
| BIM Coordinator | €40–45k | €45–60k | €60–80k |
| CAD Technician | €30–45k | €45–55k | €55–70k |
Source: Morgan McKinley Ireland salary guide 2026, construction.
On top of salary, employer PRSI is 11.40% from 1 October 2026 and My Future Fund auto-enrolment adds a 1.5% employer pension contribution (BrightSG). Our calculation from those rates: a €50,000 technician costs about €56,500 before Revit and Navisworks licences, hardware, a desk, training and the time a senior engineer spends supervising. And that cost runs in the quiet months as well as the busy ones. We break this down further in the true cost of an in-house BIM team and Ireland in-house vs Poland outsourced.
How does Artificial Modelling compare with a hire or an offshore bureau?
| In-house hire | Artificial Modelling | Offshore bureau | |
|---|---|---|---|
| Cost basis | Salary (BIM technician €35–45k at 3–5 years) plus 11.40% PRSI and 1.5% pension | Fixed price per package | Usually hourly; add your engineers’ checking time |
| Between commissions | Cost continues | Zero | Zero, unless on a retained team |
| ISO 19650 / CWMF | Depends on the hire’s experience | ISO 19650-aligned, to your BEP; founder holds a TU Dublin MSc in BIM | Varies; check naming and CDE discipline on a sample |
| Working hours | Your hours | One hour ahead of Dublin: the same working day | Often several hours ahead (India is 4½–5½ hours ahead of Ireland) |
| Data and law | Your systems | EU-based, GDPR-governed, inside your CDE | Outside the EU; check transfer terms |
| Engineering literacy | Depends on the hire | MEPF site experience since 2009 | Variable; the common failure is treating engineering as drafting |
Salaries: Morgan McKinley. PRSI and pension: BrightSG. Offshore failure mode: MVN.
What do you get at each design stage?
- Concept (RIBA Stage 2): spatial allowances for plant rooms, risers, ceiling zones and main distribution routes, so the architecture is planned around real services.
- Developed design (Stage 3): a coordinated model of the main mechanical, electrical, public health and fire protection routes, typically LOD 300.
- Technical design (Stage 4): a technical design model, typically LOD 350, with combined services drawings, builder’s work openings, plant room and riser sections and Navisworks clash reports.
- Information exchange: RVT, IFC, NWD, DWG and PDF, named and coded for the project CDE.
If your practice uses BSRIA BG6 to define model content, we work to your BG6 stage definitions rather than our own.
Who is behind the work?
Artificial Modelling was founded in 2020 by Amer Agha, whose MEPF site and coordination experience goes back to 2009, much of it in Ireland. He holds an MSc in Applied Building Information Modelling and Management from TU Dublin. He was BIM Project Information Manager at MAC Group, the contractor whose BIM Level 2 certification from BRE was reported by BIM Ireland. As Lead BIM Coordinator at Jones Engineering on the New Children’s Hospital in Dublin, he coordinated more than 100 federated models with a team of over 20 and led the move to cloud-based BIM 360 during COVID-19 with zero data loss.
So the team understands Irish projects from the inside: the healthcare and pharmaceutical work, the data centres around Dublin and the pressure of a public-sector programme. More on our About page. For how healthcare coordination goes wrong, see the real cost of poor MEP coordination on healthcare projects.
What is it like working with a team in Wrocław?
Wrocław is one hour ahead of Dublin, so your morning is our morning. We join your Teams calls, attend design team meetings remotely, and publish model drops to your CDE on an agreed cadence, usually weekly. You mark up, we coordinate, and every proposed resolution comes back to your engineer for a decision. Contracts, NDAs and data handling are covered on our trust and security page; why Poland makes sense commercially is covered in outsourcing BIM coordination to Poland and our Ireland vs UK vs Poland cost comparison.
How does the fixed-price pilot work?
Buyers usually test an outsourced team with a small real task before trusting it with a stage deliverable (BIMcorner). We make that formal: choose one floor or one plant room from a live Irish project.
- One floor or one plant roomyour models, your template
- About 10 working daysfrom complete inputs to coordinated model
- Fixed quote in 48 hoursagreed before any work starts
You get a coordinated model in your template and to your BEP naming, a Navisworks clash report with proposed resolutions and a sample combined services drawing. Put it through your own QA and your client’s information-manager checks before deciding anything bigger.
Request a pilot quoteFrequently asked questions
Can you work on Irish public projects that require ISO 19650?
Yes. We work to the project's BIM Execution Plan with ISO 19650-aligned information management: naming, classification, status codes and CDE workflow. Certificate details are available on request, and we can provide a sample of our naming and model QA for your client's information manager.
What is CWMF Milestone 6?
Milestone 6 is the stage of the Capital Works Management Framework BIM rollout that took effect on 1 January 2026. It is reported to extend ISO 19650 requirements to the supply chain on public works above 10 million euro. Thresholds differ between sources, so check each tender.
Do you replace our engineers?
No. Your engineers keep the design, calculations, specification and sign-off. We model and coordinate the services in Revit and Navisworks and bring every proposed change back to your engineer for a decision.
How do you handle time zones and meetings?
Wrocław is one hour ahead of Dublin, so we work the same day as your office. We join design team meetings and coordination calls remotely and publish model drops to your CDE on an agreed cadence.
How is the work priced?
Each package is a fixed price based on floor area, systems, LOD and coordination rounds. We return a fixed-price proposal within 48 hours and re-quote openly if the scope changes.
Which sectors do you cover in Ireland?
Data centres, healthcare, pharmaceutical facilities, education, high-rise and mixed-use buildings, and fire protection across all of them.
Sources
- EY Ireland — Construction growth to remain strong (Euroconstruct), accessed October 2026.
- Mason Hayes & Curran — Ireland’s infrastructure pipeline under NDP 2025, accessed October 2026.
- Construction News IE — Build Digital Survey 2025 results, accessed October 2026.
- Fit Out Awards — What Milestone 6 means, accessed October 2026.
- NSAI — Driving digital delivery for Ireland’s infrastructure (ISO 19650), accessed October 2026.
- BIM+ — Understanding ISO 19650-5, accessed October 2026.
- Morgan McKinley — Ireland construction salary guide 2026, accessed October 2026.
- BrightSG — My Future Fund and PRSI, Budget 2026, accessed October 2026.
- MVN — Why offshore MEP design outsourcing fails, accessed October 2026.
- BIM Ireland — MAC awarded BIM Level 2 certification, accessed October 2026.
- BIMcorner — BIM outsourcing, accessed October 2026.