Partner programme for CAD & BIM bureaux

White-label MEP BIM modelling under your name

Artificial Modelling provides white-label MEP BIM modelling and coordination for CAD and BIM bureaux in the UK and Ireland. We model and coordinate building services in Revit and Navisworks to your templates, inside your CDE, and hand the work back for you to issue under your own name. Each package is fixed price, quoted within 48 hours, and we never contact your client.

Wrocław, Poland · one hour ahead of London and Dublin · fixed price

What is white-label MEP BIM modelling?

White-label MEP BIM modelling is building services modelling and coordination that we carry out for your bureau and that you deliver to your client as your own work. You keep the client, the relationship, the fee and the credit. We supply the modelling and coordination capacity behind it: ductwork, pipework, drainage, containment, sprinkler and plant in Revit, federated and clash-checked in Navisworks, and drawn up on your sheets.

Most CAD and BIM bureaux in the UK and Ireland are small by design. That works well until two consultant clients want Stage 4 models in the same month, or a key technician leaves halfway through a hospital job. Hiring for a peak leaves people idle when it passes. A white-label partner lets you say yes to the work without carrying the payroll between commissions.

Who is the partner programme for?

The programme is built for:

If you are a consulting engineer buying for your own projects rather than reselling, our Revit MEP modelling service for consulting engineers is the better fit.

How does a white-label engagement work in practice?

  1. NDA first. We sign your non-disclosure agreement, or ours, before any file or client name changes hands. We agree the non-solicitation terms at the same time.
  2. Brief and inputs. You send the scope, the drawings or models you hold, your templates and the client's BEP. We check what is missing and tell you straight away.
  3. Fixed quote within 48 hours. The quote lists the sheets, models, level of detail, coordination rounds and dates. You add your margin and quote your client as you normally would.
  4. Modelling and coordination. We work in your template, ideally inside your CDE. Questions come to your project manager as a single, dated query log, not as scattered emails.
  5. Weekly drops. You get model updates and a short progress note on an agreed day each week, so you can show progress to your client without chasing us.
  6. QA and handover. Every package passes our internal QA check before it reaches you. You run your own checks and issue to your client under your name.

What do you need to send us?

Our article on preparing a Revit model for coordination sets out the checks that save the most time at the start of a package.

What do you get back?

How do we protect your client relationship?

Your client relationship is the asset your bureau is built on, so the rules are simple and written into the agreement:

Our trust and security page explains how project data is handled, including working inside your ACC or BIM 360 hub and GDPR as an EU-based business.

How does capacity reservation work for peaks?

Bureau work is lumpy. You often know a peak is coming weeks before the drawings arrive: a tender result, a stage gateway, a client's programme. If you tell us early, we can hold capacity for you over those weeks so the work starts the day the inputs land. Reservation terms are agreed per partner. Between peaks there are no packages, so there is nothing to pay.

Because we work one hour ahead of London and Dublin, a query raised in your morning is answered in your morning. That matters more than it sounds: the hidden cost of outsourcing is usually the time your senior people spend chasing and checking. We cover that in the management overhead nobody talks about.

How does a white-label partner compare with a freelancer or an offshore subcontractor?

Most bureaux cover overflow in one of three ways: a UK or Irish freelancer on a day rate, an offshore subcontractor, or an EU-based partner such as Artificial Modelling. Each has a place. The table sets out the trade-offs we hear about most often from bureau owners.

Overflow options for a CAD/BIM bureau
 Freelance Revit technicianArtificial Modelling white-labelOffshore subcontractor
How it is pricedDay rate; a UK BIM technician contract was advertised at £350–400 per dayFixed price per package, quoted within 48 hoursUsually hourly or per sheet
Who carries the overrunYou: more days means a bigger invoiceWe do, within the agreed scopeVaries by contract
Working hoursYour time zoneOne hour ahead of London and Dublin: the same working dayOften several hours apart, depending on location
CapacityOne person; unavailable when booked elsewhere or on leaveA coordination team rather than one person; capacity can be reserved ahead of known peaksLarge teams, but output quality varies between individuals
Coordination knowledgeDepends on the individualCoordinators with MEPF site experience, led by a founder on site since 2009Often strong at drafting; the common failure is treating engineering as drafting
Data jurisdictionUK or IrelandEU-based; GDPR applies directlyOutside the EU and UK; contractual safeguards needed
QA before you see itSelf-checkedInternal QA check on every package before handoverVaries by provider

Day rate: ContractorUK BIM technician listing. Offshore failure mode: MVN. Other rows describe typical arrangements, not a specific provider.

How is quality checked before handover?

Every package goes through an internal QA check before it reaches you. We check the model against your template and the client's BEP, confirm that clash tests have been run and resolved or logged, and review the sheets for annotation, tags and title-block data. Our coordinators come from the site side. They look for the problems installers find: valve access, maintenance clearance, ceiling zone depth and whether a hanger can actually be fixed where the model puts it.

We would rather you judged us on your own QA than on our claims. The guide to evaluating a BIM coordination partner lists the questions we suggest you ask any subcontractor, including us. For clash work specifically, see our MEP clash detection service.

How does the fixed-price pilot work?

The safest way to test a white-label partner is on a real but contained piece of work. Giving a prospective partner a small trial task is a common way to check the concerns before trusting them with more (BIMcorner). Choose one floor or one plant room from a current job, and we will model and coordinate it in your template.

  • One floor or one plant roomyour models, your template
  • About 10 working daysfrom complete inputs to coordinated model
  • Fixed quote in 48 hoursagreed before any work starts

You get back the Revit models, the Navisworks clash report and the sheets, ready for your own QA. If it passes, you have a partner you can offer to your clients with confidence. If it does not, you have spent a fixed, known amount to find out. Fixed pricing is explained in why fixed-price BIM coordination changes everything.

Request a pilot quote

Frequently asked questions

What does white-label MEP BIM modelling mean?

It means we model and coordinate mechanical, electrical and public health services for your bureau, and you issue the work to your client under your own name. Our name does not appear on models, sheets, title blocks, transmittals or emails to your client unless you ask for it.

Will you ever contact our client directly?

No. All communication runs through your project manager. We agree a non-solicitation clause before the first package, and we do not approach, quote or pitch to your clients during the partnership or after it ends.

Do you work to our templates and standards?

Yes. We work in your Revit templates, families, title blocks and naming conventions, and to the BIM Execution Plan your client has agreed. If your standards and the client's requirements conflict, we raise it with you before modelling rather than guessing.

How is a white-label package priced?

Each package is fixed price, quoted within 48 hours of receiving the brief and the inputs. Commercial terms for ongoing partners, such as reserved capacity, are agreed per partner. If the scope changes, we re-quote transparently before doing the extra work.

Can you work inside our CDE rather than receiving files?

Yes. We can work inside your Autodesk Construction Cloud or BIM 360 hub using accounts you create and control, so the models never leave your environment. You can remove our access at any time.

How do we test you before committing a live client job?

Start with a fixed-price pilot: one floor or one plant room, coordinated in about 10 working days, with a fixed quote within 48 hours. Run it through your own QA, and judge it as your client would.

Sources

  1. ContractorUK — BIM technician contract listing, accessed October 2026.
  2. MVN — Why offshore MEP design outsourcing fails, accessed October 2026.
  3. BIMcorner — BIM outsourcing, accessed October 2026.

Need overflow capacity you can put your name on?

Send us a brief and we will return a fixed-price proposal within 48 hours. NDA first, always.