Who is Amer Agha?
Amer Agha is the founder of Artificial Modelling, an MEP BIM coordination and Revit MEP modelling firm based in Wrocław, Poland. He set the company up in 2020 and is still the person who scopes each project, runs the coordination reviews and signs off every package before it reaches a client. The legal entity behind the trading name is BiM Amer Agha, registered in Poland under NIP 5423406315.
He came to BIM from the site side. Since 2009 he has worked on mechanical, electrical, public health and fire protection (MEPF) projects, first on site and then in coordination, which adds up to more than 15 years of experience across data centres, hospitals, pharmaceutical facilities and commercial buildings in Ireland, the UK and Europe. That background shapes how Artificial Modelling works: a model is coordinated when the systems in it can be installed, reached and maintained, not only when the clash report is empty.
Amer holds an MSc in Applied Building Information Modelling and Management (2.1 Honours) from TU Dublin. Before founding Artificial Modelling he was BIM Project Information Manager at MAC Group, where he led the information-management process behind MAC Group's BIM Level 2 certification from BRE. That certification belongs to MAC Group, his former employer; it is part of his experience and is not a certification held by Artificial Modelling. As Lead BIM Coordinator at Jones Engineering on the New Children's Hospital in Dublin, he coordinated more than 100 federated models with a team of more than 20 people and led the project's move from local servers to cloud-based BIM 360 during COVID-19, with zero data loss.
Day to day he works in Autodesk Revit, Navisworks and Autodesk Construction Cloud / BIM 360, following ISO 19650-aligned information management and each client's BIM Execution Plan, naming conventions and CDE workflow. Artificial Modelling's clients are mainly building services (M&E) consulting engineers working at RIBA Stages 2 to 4 in Ireland and the UK, with MEP design-and-build contractors and CAD/BIM bureaux making up the rest. The working language is English, and every package is quoted at a fixed price in euros.
He also writes the Artificial Modelling blog. The recurring themes are design-stage coordination, model preparation, the choice between Revit and Navisworks for clash detection, and the real cost of decisions made, or not made, in the model.
Credentials
- MSc in Applied Building Information Modelling & Management, TU Dublin, 2.1 Honours.
- 15+ years of MEPF site and coordination experience, on projects since 2009 in Ireland, the UK and Europe.
- Tools: Autodesk Revit, Navisworks Manage, Autodesk Construction Cloud / BIM 360.
- Information management: ISO 19650-aligned, working to each client's BIM Execution Plan. Artificial Modelling does not hold an ISO 19650 certification; details of certificates and insurance are available on request.
- Working language: English.
Previous roles
BIM Project Information Manager
Led the information-management process behind MAC Group's BIM Level 2 certification from BRE, as reported by BIM Ireland. The certification was awarded to MAC Group and belongs to that company, not to Artificial Modelling.
Lead BIM Coordinator, New Children's Hospital Dublin
Coordinated more than 100 federated models with a team of more than 20 people, and led the project's move from local servers to cloud-based BIM 360 during COVID-19 with zero data loss.
Source: LinkedIn recommendation by Abdulrahim Alhendi, Planning Manager at Jones Engineering, quoted on the Artificial Modelling homepage.
“Working with Amer has been nothing less than exceptional. As Lead BIM Coordinator, Amer played a key role in migrating over 100 models of our New Children’s Hospital project from local servers to the cloud. Establishing a new system, and efficiently training the team — all achieved with zero data loss.”
Writes about
Five articles from the Artificial Modelling blog on design-stage MEP coordination:
- What Is MEP BIM Coordination? A Complete Guide
- Why Site-Based Experience Matters in BIM Coordination
- Preparing Your Revit Model for Coordination: The Cost of Unprepared Models
- Revit vs Navisworks for MEP Clash Detection — When to Use Which
- The Cost of One Clash: From Model to Site to Fix
The full list is on the blog index.
At a glance
| Role | Founder & MEP BIM Coordinator, Artificial Modelling |
|---|---|
| Founded | Artificial Modelling, 2020 (legal entity BiM Amer Agha, NIP 5423406315, Wrocław) |
| Education | MSc Applied Building Information Modelling & Management, TU Dublin (2.1 Hons) |
| Experience | MEPF site and coordination since 2009 |
| Software | Autodesk Revit, Navisworks Manage, Autodesk Construction Cloud / BIM 360 |
| Based in | Wrocław, Poland (Central European Time, one hour ahead of the UK and Ireland) |
| linkedin.com/in/3ameragha | |
| amer@artificialmodelling.com |
Sources
- BIM Ireland — MAC awarded global BIM Level 2 certification, accessed October 2026.
- Artificial Modelling — LinkedIn recommendations quoted on the homepage, including Abdulrahim Alhendi, Planning Manager, Jones Engineering.