About us

About Artificial Modelling: MEP BIM from the site side

Artificial Modelling is an MEP BIM coordination and Revit MEP modelling firm based in Wrocław, Poland, founded in 2020 by Amer Agha. We work mainly for building services (M&E) consulting engineers at RIBA Stages 2–4 in Ireland, the UK and Europe, and also for MEP contractors and CAD/BIM bureaux that need overflow capacity. Every package is fixed price and delivered on the same working day as London and Dublin.

Wrocław, Poland · one hour ahead of London and Dublin · fixed price

What does Artificial Modelling do?

We model and coordinate building services. In practice that means taking an engineer's design for mechanical, electrical, public health and fire protection systems and turning it into a coordinated Revit model, a federated Navisworks model with clashes found and resolved, and the drawings that go with them: general arrangements, combined services drawings, sections and builder's work openings.

Most of our work happens at design stage, between RIBA Stage 2 and Stage 4, when the consulting engineer is responsible for spatial coordination and the cost of moving a duct is a few minutes of modelling rather than a site instruction. Our building services BIM coordination page explains how that work maps to the RIBA Plan of Work and BSRIA BG6. We also carry coordination through to construction-stage detail when a project needs it, up to LOD 500 for as-built records.

Who do we work for?

We also work for clients across mainland Europe and further afield, always in English and in metric units. For Irish public-sector work, our page on MEP BIM outsourcing in Ireland covers ISO 19650 requirements under the Capital Works Management Framework.

Who is behind Artificial Modelling?

Artificial Modelling was founded in 2020 by Amer Agha, who leads the company as founder and lead BIM coordinator. His background is the reason the company works the way it does: he came to BIM from the site side, not the other way round.

Site experience since 2009

Amer has worked on MEPF projects since 2009, more than 15 years of site and coordination experience across data centres, hospitals, pharmaceutical facilities and commercial projects in Ireland, the UK and Europe. That time on site is where he learned what a coordinated model has to deliver: a valve that can be reached, a filter that can be changed, a hanger that can actually be fixed to the structure above.

MSc in Applied BIM and Management, TU Dublin

He holds an MSc in Applied Building Information Modelling and Management (2.1 Honours) from TU Dublin, a programme accredited by the Chartered Institute of Building (CIOB). He studied on the dual stream covering mechanical and electrical engineering together with construction management, which is the combination our clients' projects need.

BIM Project Information Manager, MAC Group

Before founding Artificial Modelling, Amer was BIM Project Information Manager at MAC Group, where he led the information management process behind the company's BIM Level 2 certification from BRE. That certification was awarded to MAC Group, as reported by BIM Ireland; it is part of Amer's experience, not a certification held by Artificial Modelling.

Lead BIM Coordinator, Jones Engineering, New Children's Hospital Dublin

As Lead BIM Coordinator at Jones Engineering on the New Children's Hospital in Dublin, Amer managed the coordination of more than 100 federated models with a team of more than 20 people. During COVID-19 he led the project's move from local servers to cloud-based BIM 360.

Why does site experience matter in design-stage coordination?

A clash report can be technically clean and still unbuildable. Automated clash detection finds a pipe through a beam. It does not tell you that the only route for the pipe leaves no room to maintain the fan coil unit beneath it, or that the ceiling void works on paper but not once insulation, hangers and sprinkler drops are in. Those judgements come from having installed and commissioned systems. We explain this in more depth in why site-based experience matters in BIM coordination.

For consultants, this matters most at Stage 4. A coordinated design that a contractor can build with few queries protects your fee, your programme and your reputation, and in the UK a complete, fully coordinated technical design is now part of what a Gateway 2 submission for a higher-risk building has to show (PowerOn).

How do we work with consultancies?

  1. A short call to understand the project, the stage, the deadline and your standards.
  2. A fixed-price proposal within 48 hours of receiving the brief and inputs, listing models, sheets, level of detail and coordination rounds.
  3. Work in your template and your CDE, to your BIM Execution Plan and naming conventions, with one point of contact.
  4. Weekly model drops and a query log, so your engineers mark up and we coordinate.
  5. Internal QA on every package before it reaches you.

Fixed price is deliberate. When we bill by the package rather than the hour, we have every reason to work efficiently and none to let scope drift. Our article on fixed-price BIM coordination sets out the reasoning. If you want to test us first, see the fixed-price pilot: one floor or one plant room, coordinated in about 10 working days.

Which sectors do we know best?

If you are new to the subject, our complete guide to MEP BIM coordination and our explainer on LOD 500 delivery are good places to start.

What are the company details?

Procurement teams usually need these before a first appointment. Anything not listed here, such as insurance certificates or a completed supplier questionnaire, is available on request.

Artificial Modelling at a glance
Trading nameArtificial Modelling
Legal entityBiM Amer Agha, sole proprietorship (JDG) registered in Poland
Tax numberNIP 5423406315 (EU VAT: PL5423406315)
Addressul. Mieszczańska 31, 50-201 Wrocław, Poland
Founded2020
Time zoneCentral European Time, one hour ahead of the UK and Ireland
Working languageEnglish
SoftwareAutodesk Revit 2023–2025, Navisworks Manage, BIM 360 / Autodesk Construction Cloud
DeliverablesRVT, NWD, IFC, DWG, PDF
PricingFixed price per package; proposal within 48 hours
DataEU-based, GDPR-governed; see trust and security
Contact+48 534 455 075 · amer@artificialmodelling.com

What do people who have worked with us say?

Artificial Modelling holds a 4.9-star rating on Google from 18 reviews. Two LinkedIn recommendations speak directly to the background described above:

“I had the opportunity to engage with Amer Agha during his capstone project for his master’s degree in Applied Building Information Modelling and Management, while he was based in Ireland. Our discussions throughout our interactions demonstrate his deep understanding of BIM standards and management.”

Ralph Montague, Director, Arcdox · LinkedIn recommendation

“Working with Amer has been nothing less than exceptional. As Lead BIM Coordinator, Amer played a key role in migrating over 100 models of our New Children’s Hospital project from local servers to the cloud. Establishing a new system, and efficiently training the team — all achieved with zero data loss.”

Abdulrahim Alhendi, Planning Manager, Jones Engineering · LinkedIn recommendation

Frequently asked questions

Where is Artificial Modelling based?

We are based at ul. Mieszczańska 31, 50-201 Wrocław, Poland. Poland is one hour ahead of the UK and Ireland, so we work the same working day as clients in London, Dublin, Belfast and Cork.

Who founded Artificial Modelling, and when?

Amer Agha founded Artificial Modelling in 2020. He has worked on MEPF projects on site and in coordination since 2009, holds an MSc in Applied Building Information Modelling and Management from TU Dublin, and was Lead BIM Coordinator at Jones Engineering on the New Children's Hospital in Dublin.

What is the legal entity behind Artificial Modelling?

Artificial Modelling is the trading name of BiM Amer Agha, a Polish sole proprietorship (jednoosobowa działalność gospodarcza) registered under NIP 5423406315. Contracts and invoices are issued by that entity.

Who are your typical clients?

Our main clients are building services (M&E) consulting engineers working at RIBA Stages 2 to 4 in Ireland, the UK and Europe. We also work for MEP design-and-build contractors and for CAD and BIM bureaux that need white-label overflow capacity.

Is Artificial Modelling ISO 19650 certified?

We follow ISO 19650-aligned information management and work to each client's BIM Execution Plan, naming conventions and CDE workflow. Details of certificates and insurance are available on request. The BRE BIM Level 2 certification mentioned in Amer's background belongs to MAC Group, his former employer, not to Artificial Modelling.

How do we start working with you?

Book a call or email amer@artificialmodelling.com with a short description of the project. We return a fixed-price proposal within 48 hours of receiving the brief and inputs, and many clients start with a fixed-price pilot on one floor or one plant room.

Sources

  1. BIM Ireland — MAC awarded global BIM Level 2 certification, accessed October 2026.
  2. Google — Artificial Modelling reviews, accessed October 2026.
  3. PowerOn — Gateway 2 requirements for M&E professionals explained, accessed October 2026.

Talk to the person who will run your project

Send us a brief and we will return a fixed-price proposal within 48 hours.